Six equivalent statements about data centres and clean air

Summary of this article*

  1. Chinese solar panel manufacturing loses money.
  2. AI data centres with “behind-the-meter” (a.k.a., “off-grid,” “on-site,” “their own”) electric power generation produce artificial content at the exa-FLOPS scale, all of it with synchronous power generation, which is almost always gas-fired.
  3. AI data centres with “behind-the-meter” (a.k.a., “off-grid,” “on-site,” “their own”) electric power generation produce artificial content at the exa-FLOPS scale, none of it solar- or wind-powered.
  4. AI data centres with with “behind-the-meter” (a.k.a., “off-grid,” “on-site,” “their own”) electric power generation have clean air problems because of the preceding two points.
  5. Generating artificial content at the exa-FLOPS scale requires baseload electric power supply, at the hundred-megawatt scale with a very exacting availability standard, i.e., with “blips” in electric power availability for the data centre processors that cumulatively, over an 8,760-hour year, amount to less than 4 seconds.
  6. If it were true that the cost of wind and solar power is dropping, the previous five points would be false.

THE END

  1. Just as the function ex is its own derivative, this article is its own summary.